MEGASYS Computer Systems
Calgary, Alberta
The Megasys building project included the design and construction of a new 35,200 sq. ft. three-storey multi-use office building and interior fit-up for the Canadian Food Inspection Agency tenant. The project also required the design and construction of a +15 link to the adjacent two-storey office building. The new design and link had to coordinate seamlessly with the existing building.
The CFIA interior fit-up included architectural layout design, interior design consultation, and tenant specific mechanical and electrical requirements. Berry Architecture provided full architectural drawings for the base building and coordination of the interior fit-up including staging and moving.