Diamond Spring Lodge

Image Gallery

Diamond Spring Lodge

 Diamond Spring Lodge in Redwater needed an expansion and renovation of the existing lodge. The project includes demolition of one wing of the existing lodge (13 suites); renovations to the remaining lodge; and a two storey addition with crawl space. The addition includes 24 new suites with a mixture of bachelor and one-bedroom units, plus a number of amenity spaces—chapel, hair salon, activity rooms, commercial laundry, assisted bath, scooter storage room, lounge/flex spaces on each floor, and resident laundry rooms on each floor. The lodge will have a total of 51 suites when completed (27 existing suites remain). Renovations to the existing lodge include installing a sprinkler system, restoring an existing suite, converting the current hair salon into a reception office, enlarging the resident laundry room, and enlarging the staff room. The new exterior will complement the finishes of the existing building. This is a Design-Build project we are undertaking with Krawford Construction. Project is currently in the Construction Documents phase. The completion target is 2019.

 Key Features

  • 2 storey addition, renovation, and demolition project
  • 51 suites with mix of bachelor and one bedroom units